Real numbers. No "call for estimate" runaround. These are the ranges we quote every week across 12 counties — updated for 2026 material costs.
If the sub-base needs to be excavated and rebuilt, costs increase 40–60%. This is the #1 cost variable.
Standard residential is 2.5–3". Heavy-use (RVs, trailers) needs 4". Commercial lots require 3–4". More depth = more material.
Tight lots, steep grades, or rural properties with long haul distances from the asphalt plant affect equipment and material delivery costs.
If grading, French drains, or culvert work is needed to prevent water pooling, this adds to the project scope.
Larger projects have lower per-square-foot costs due to equipment mobilization and material delivery efficiencies.
| Factor | Overlay | Full Replacement |
|---|---|---|
| Cost per sq ft | $2 – $4 | $5 – $9 |
| 600 sq ft driveway | $1,200 – $2,400 | $3,000 – $5,400 |
| Time to complete | 4 – 8 hours | 1 – 2 days |
| Expected lifespan | 10 – 15 years | 15 – 20 years |
| Base must be solid? | Yes — required | No — we rebuild it |
| Savings vs. replacement | ~40% | — |
Itemized. Transparent. Delivered within 24 hours.
(903) 885-6388