$3–$7 per square foot installed. Most Greenville driveways done in 1–2 days. Owner Paul Pogue on every jobsite. Free itemized quote in 24 hours — no padding, no surprises.
Residential asphalt driveways in Greenville run $3–$7 per square foot installed. The wide range reflects real differences in spec — not contractor markup. A 2-inch surface over a thin base is at the low end and won't last. A 3-inch surface over 6 inches of compacted base is the upper end and lasts 20 years.
Every quote is itemized line by line: tear-out, hauling, grading, base material, base compaction, asphalt tonnage, paving, rolling, edge work, cleanup. Compare apples-to-apples with any other contractor.
| Driveway | Size | Cost Range |
|---|---|---|
| Single car, standard | ~400 sq ft | $1,200–$2,800 |
| Two car, standard | ~600 sq ft | $1,800–$4,200 |
| Two car + walk to door | ~800 sq ft | $2,400–$5,600 |
| Long rural drive | 1,500+ sq ft | $4,500–$10,500+ |
Greenville sits on the Blackland Prairie's eastern edge — heavy expansive clay soil that swells when wet and shrinks when dry. That ground movement is the single biggest reason Hunt County driveways fail early. We engineer the base to absorb seasonal soil movement so the surface stays intact.
The fix: 4–6 inches of compacted aggregate base, properly graded for drainage, under 2.5–3 inches of TxDOT-spec hot-mix asphalt. Heavy-use driveways get 4 inches of asphalt. The base is what determines whether your driveway lasts 8 years or 20.
Overlay — right call when base is solid, damage is surface-level only. Saves about 40%. Lasts 10–15 years on a sound base.
Full replacement — required when base has failed (alligator cracking, potholes, heaving). Overlay over failed base just fails again in 2–3 years.
Paul evaluates this on every Greenville site visit at no charge. We tell you what your driveway actually needs.
$3–$7 per square foot installed. Standard 600 sq ft driveway runs $1,800–$4,200.
15–20 years with sealcoating every 3–5 years. Hunt County's expansive clay makes proper base prep more important here than in most of Texas.
Standard residential: 2.5–3 inches over 4–6 inches of base. Heavy-use: 4 inches of asphalt over 6–8 inches of base.
1–2 days. Walkable in 4–6 hours, drivable in 24–48 hours.
Yes — full tear-out, hauling, grading, sub-base prep included.
Overlay if base is solid. Replace if base has failed. Paul evaluates in person at no charge.